We read the papers so you do not have to, and we link every one.
The Current covers New England in New South Wales: Tamworth, Armidale and
the Northern Tablelands, across nine councils from Liverpool Plains to Tenterfield, with some Narrabri stories.
Council business papers, planning applications, health and water reports. We read them
end to end, write what they mean, and link the document behind every factual claim.
A new draft flood study for Tenterfield Creek puts the flood planning level about 1.3 metres above the existing level near the Douglas Street bridge, and about 1.6 metres above it with a 2050 climate allowance. Councillors are asked to put it on exhibition from 1 December.
Warialda's pool opened on 23 October. A consultant's inspection for Gwydir Shire found concrete cancer, leaks and failing plant, put its remaining life at about one to two years, and estimated a new 50-metre pool and water play area at $6 million to $6.3 million.
Generators joining the New England REZ's existing lines would pay about $1,809 a megawatt a year for community purposes and $639 for jobs, the regulation's minimums plus inflation. Submissions closed 5pm on 19 November.
Tamworth's draft airport master plan forecasts about 120,300 aircraft movements a year by 2046, mostly flight training. That is the traffic the official noise map assumed for 2062, and the plan says the map should be redone. Submissions close 25 November.
A state study in Tamworth homes found servicing an evaporative cooler saves 2,000 to 4,000 litres a year. Tamworth has paid $261,830 in cooler-service rebates since 2019, and its staff recommend a review.
EnergyCo's 300 km New England REZ transmission project is on exhibition until Thursday 26 November. Its EIS pays host landholders $200,000 a kilometre over 20 years, and rates the uneven spread of impacts on neighbours as very high.
A report to Tamworth Regional Council on 10 November asked councillors to investigate medium-density R3 zones near the CBD, hospitals and schools and the removal of restrictive planning controls. Any change waits for a 2027 plan review, and a developer levy for affordable homes is not recommended.
Tamworth Regional Council's draft Renewable Energy Contributions Policy lifts its minimum rates 25% above the state's. It also moves the first payment from the start of construction to 20 business days after a project starts operating, and halves the upfront share.
The University of New England, regional development reports and the numbers behind the district economy.
The councils whose papers we read
Armidale Regional
Tamworth Regional
Uralla
Walcha
Glen Innes Severn
Inverell
Tenterfield
Gwydir
Liverpool Plains
Seen a document we should read?
A business paper, an exhibition notice, a report nobody has written up. Send it in.
Tips can be anonymous, and we check every claim against the source before anything runs.