If you own, rent or plan to build on land near Tenterfield Creek, this is the document to read this summer. The draft Tenterfield Flood Study Update 2025 was prepared by Kingfisher Hydro with Michael Wood and Associates, under a grant from the state's Floodplain Management Program, and is attached to item ENV16/26 in the business paper for the council's 26 November meeting. It replaces the creek's flood modelling, which dates from a 2005 study and a 2014 update.
The study's description of the town explains why it matters. Tenterfield, a town of about 4,000 people,
is cut through by Tenterfield Creek, and because it sits near the top of a steep catchment, the study says
the town can be vulnerable to flash flooding, particularly in high-intensity rainfall events.
It lists notable floods in 1976, October 1999, February 2001 and, most significantly, January 2011, when
Tenterfield was temporarily divided when floodwaters overtopped the New England Highway
.
Why the numbers moved
The consultants built new computer models of the catchment and the creek, tuned them to reproduce the January 2011 flood and checked them against February 2001. They then modelled design floods using the current national guidance, Australian Rainfall and Runoff 2019. When they reran the main floods with the older 1987 rainfall data, the creek came out lower at every location they checked: by 0.01 to 0.33 metres for the 1-in-100 flood. The newer method expects heavier rain in big storms.
The 1-in-100 flood (in the study's terms, the 1% annual exceedance probability flood, one with a 1 per cent chance of being reached or passed in any year) is the one the planning rules are built on. In the town centre, from upstream of the Douglas Street bridge down to Ghost Gully, the study's 1-in-100 flood peaks only 11 to 15 centimetres above its modelled peak for January 2011. At five of its 14 measuring points, mostly downstream of town, its modelled 2011 flood was higher than the 1-in-100 flood (our arithmetic, panel B). Put plainly, the flood the rules are designed around is, in the town centre, roughly 2011 again.
The planning line
The council's development control plan defines the flood planning level, the study says, as
The level of a 1% Annual Exceedance Probability (AEP) flood event plus 0.5 metres freeboard.
Land below that level is the flood planning area, where flood-related planning and development controls
apply. Using its new 1-in-100 flood, the study compares the new level with the existing one, which it calls
the 2013 level.
Exhibit A · from the source
Near the Douglas Street Bridge, the 2026 Flood Study FPL under current climate conditions differs from the existing 2013 FPL by approximately 1.3 m. This indicates a substantial increase in the FPL compared with the existing adopted level in this area.
Near the Douglas Street Bridge, the 2026 Flood Study FPL under the 2050 climate change scenario (SSP2-4.5) differs from the existing 2013 FPL by approximately 1.6 m.
The gap narrows downstream. Near the High Street and Molesworth Street bridges the study puts the new level about 0.9 to 1.0 metres above the existing one, and near the Naas Street bridge about 0.5 metres. With the 2050 allowance, the gap runs from about 1.6 metres near Douglas Street to about 0.7 metres near Naas Street. That allowance assumes 19.05 per cent more rain in the design storm, under the intermediate emissions scenario, and adds about 0.25 to 0.41 metres to the 1-in-100 flood through town. The study maps the old and new flood planning areas side by side in its Figure 7-4 and Annex E; those maps are the place to check a particular street.
The study does not choose the level. It says
Council may determine the most appropriate Flood Planning Level to adopt, having regard to risk tolerance, land use characteristics, and relevant policy considerations
,
and recommends that the choice, including the 2050 option, be made in the next stage of the process, a
Floodplain Risk Management Study and Plan, alongside a review of the town's flood warning system. It does
not count how many homes or buildings sit below either new level; none of its sections assesses flood
damage.
What councillors are asked to decide
The cover report, item ENV16/26 from the Director of Infrastructure Services, recommends that the council
Adopts the draft Tenterfield Flood Study Report as prepared by Kingfisher Hydro
,
puts it on public exhibition, and asks staff for a further report after exhibition with the submissions and
a final version for adoption. The report describes the exhibition in two ways: as running
for the month of December 2026
in the recommendation, and, in its implications section, as running from 1 December 2026 with submissions
closing 29 January 2027, extended because of Christmas and New Year.
Its financial implications are
Nil
,
and its assessment of risk is one sentence:
This is low risk due to the relatively low impact of the modelled flood, as compared to the flood impact of more affected communities on the coastal floodplain.
The report does not mention the flood planning level, the 2011 comparison or the climate allowance.
For most residents the exhibition will be the first real look at the study. Its consultation chapter says a
community session was held and advertised, but
Despite these efforts, attendance from the general public was minimal.
A preliminary draft went to the state environment department, the State Emergency Service and council
officers before exhibition.
Our view
The study itself is careful and candid. It shows its working, tests its method against the old one, and says in plain words that the new planning level is a substantial increase. The cover report is the weak link. A one-line risk rating that compares Tenterfield with the coast tells councillors nothing about what changes for people near the creek, and what changes is the line that new floor levels and building approvals are measured against, by up to 1.3 metres near Douglas Street.
Two things would help before and during the exhibition. The first is a plain statement, in the council's own words, of how far the planning line moves street by street, with the maps, so owners can find their land without reading the whole study. The second is an answer to a question the report leaves open: until the council adopts a new level through the floodplain risk management plan, which level will it use for building applications near the creek? With a “Nil” budget line and no date for that plan, owners deserve to know.
The extension of submissions to 29 January is sensible for an exhibition over Christmas. We will report what councillors decide when the minutes are published, and how to make a submission once the exhibition opens.
How measured · our arithmetic
| Location (study ID) | January 2011 | 1-in-100 | Difference |
|---|---|---|---|
| Upstream of Douglas St bridge (3) | 844.08 | 844.23 | 0.15 |
| Upstream of Manners St bridge (4) | 841.75 | 841.88 | 0.13 |
| Upstream of High St bridge (5) | 841.22 | 841.36 | 0.14 |
| Upstream of Molesworth St bridge (6) | 840.78 | 840.92 | 0.14 |
| Upstream of Naas St bridge (7) | 838.60 | 838.71 | 0.11 |
| Upstream of Willows bridge (8) | 837.64 | 837.75 | 0.11 |
| Ghost Gully confluence (9) | 833.53 | 833.68 | 0.15 |
The arithmetic. Each difference is the 1-in-100 level minus the January 2011 level, so 844.23 minus 844.08 is 0.15 metres, and so on; the range is 0.11 to 0.15 metres. At the other seven points the 2011 flood was higher at five: downstream of Mt McKenzie Road (887.71 against 887.66, 0.05 higher), upstream of the Mt Lindsay Road bridge (835.46 against 835.38, 0.08), the Washpool Creek confluence (820.72 against 820.65, 0.07), the Doctors Nose Creek confluence (802.74 against 802.48, 0.26) and upstream of the Sunnyside rail bridge (792.60 against 792.39, 0.21). Location names are from Table 5-8 on page 42. The 1987 against 2019 range (0.01 to 0.33 metres) is the smallest and largest 1-in-100 value in Table 6-4 on page 55. The 2050 range through town (0.25 to 0.41 metres) is the smallest and largest of locations 3 to 9 in the 2050 intermediate-scenario column of Table 6-8 on page 60. Both 2011 and 1-in-100 levels are modelled, not gauged.
Sources
Method. Researched and drafted with AI, straight from the primary sources below. Software matched 11 quotations exactly against our stored copies of their sources. How The Current works.
- Tenterfield Shire Council, Business Paper, Ordinary Council Meeting, 26 November 2026 (PDF, 419 pages, read 21 November 2026), item ENV16/26, Tenterfield Flood Study, pages 41 to 43: the recommendation, the exhibition dates, and the financial and risk implications.
- Kingfisher Hydro for Tenterfield Shire Council, Tenterfield Flood Study Update 2025, Public Exhibition Draft (report R.24005.001.03), attachment 1 to item ENV16/26 in the same business paper (business paper pages 44 onward; study page N is business paper page N plus 44): background and catchment (pages 5 and 6), the January 2011 flood (page 22), design flood levels (pages 42 and 43), the 1987 and 2019 comparison (pages 54 and 55), climate change (pages 58 to 60), the flood planning level and area (pages 74 to 76), consultation (page 78) and recommendations (page 79). Shown in Exhibit A; the inputs to panel B.
- Tenterfield Shire Council, Council business papers (web page, checked 21 November 2026): the 26 November agenda listed; the meeting is at 9.30am on Thursday 26 November in the Koreelah Room, Rouse Street.
How we did this
We read the council's report from the business paper's text layer, and the sections of the flood study listed above from page images, because the study is printed into the business paper as images; we quote the study from our transcription. The comparisons in panel B are our arithmetic on the study's own tables. The flood planning level gaps (1.3, 0.9 to 1.0, 0.5, 1.6 and 0.7 metres) are the study's figures, not ours. The meeting had not happened when we wrote this, so we report what councillors are asked to decide, not what they decided. We name the consulting firms but not their staff, and no resident is named. We asked the council on 21 November 2026 which flood planning level it will apply to development applications near the creek until a new one is adopted; we will add its answer here, or say that it has not answered. The “our view” section is opinion based on the documents described.